26.05.15./ Second Montage Day

by Tuesday, May 26, 2015 0 comments

Our project stands here:

Some drawings of details:








Details:

Our last tripe has been completed.  We have 3 different stripes with different lenghts in total.



Direction of needles makes compositional integrity and adds dynamic view.


To be sure that our project will stand long enough it was covered with varnish.





Project consists three sripes that can be easily connected to each other, so the place of project and it's composition can be changed depending on wish.








Look from inside


Approved by our friends:)



It took pretty a lot time to make the last decision of project's location.




Last desicion of location:








Some try-out with postures:








Our poster:




Emre Cincaner
Hasan Kotan
Seyda Ozcan 
Ayza Kurbanova

Unknown

Developer

Cras justo odio, dapibus ac facilisis in, egestas eget quam. Curabitur blandit tempus porttitor. Vivamus sagittis lacus vel augue laoreet rutrum faucibus dolor auctor.

0 comments:

Post a Comment